PS2515
The project proposal “PS2515” is the result of a thorough research and study concerning the supply & installation of an innovative sustainable swimming facility, with a semi-Olympic sized pool, for sports, recreation and rehabilitation, which has been pre-approved by the General Secretariat for Sports.

In detail, it includes:
Industrialized stainless steel swimming pool, with Myrtha Pools technology, measuring 25,00×15,50×2,00m. Myrtha Pools, is considered the most modern, environmentally friendly and sustainable in operation technology. Similar swimming pools have been installed in the largest international events (Olympic Games, World Championships, etc.).
Industrialized building of supporting facilities with the necessary electromechanical equipment (men’s and women’s changing rooms, W.C. for public and people with disabilities, canteen, lobby, storage room, office and medical office).
Industrialized room for the electromechanical equipment of the swimming pool
Perimeter fencing of the area
Competitive & general equipment for the swimming pool and changing rooms





The choice of materials and the methodology of construction of the swimming facility are based on the most modern available on the market, achieving:
- Guaranteed final result
- Quick installation (<60% compared to conventional constructions)
- Minimization of crews involved
- No revisions and cost increase during implementation
- High durability and multi-year warranty
- Minimal to zero maintenance costs
The “PS2515” proposal can be adapted to the specificities of each region to fully meet local needs and can be enriched with:
- Spectator stands
Temporary / seasonal housing (telescopic canopy, air-supported canopy, etc.) - Solar panels
- Photovoltaic system
- Kiddie Pool etc.