Search

P.E.K. IOANNION

POOL SPORT was declared the contractor in the tender of the Region of Epirus for the supply & installation of new electronic starting blocks and the necessary support infrastructure (bases) in the swimming pool of Limnopoula in Ioannina. This supply was made under the general upgrade of the swimming pool of P.E.A.K. Ioannina due to the 27th European Championship of Technical Swimming. The top OMEGA OSB 11 electronic starting blocks used exclusively in the Olympic Games & World Championships were installed.

Scroll to Top