Company
POOL SPORT INSTALLATIONS, a member of the “POOL SPORT Group” specializes in the field of Aquatics and sports facilities and more specifically, is active in trading, installation and maintenance:
– Industrialized swimming pools of all types
– Electromechanical equipment for swimming pools
– Equipment for the housing / sheltering of swimming pools and sports facilities
– Competitive sports & swimming equipment
– Thermal insulation covers for swimming pools
– Electronic sports timing and results display equipment
– General equipment for sports facilities
It is an official representative / supplier / dealer / distributor of leading international companies in the field of Wet Athletics, such as Myrtha Pools (stainless steel swimming pools), MALMSTEN AB (racing equipment), Swiss Timing – OMEGA (electronic timing), Favaretti Group (thermal insulation covers) etc. and has completed major projects in Greece and Cyprus.
It has constructed more than 15 Olympic & semi-Olympic size swimming pools and a large number of smaller pools in municipalities, private sports centres, residential buildings etc.
It was the exclusive supplier of competitive swimming equipment in all international AQUATICS events hosted in Greece (Olympic Games, World & European Championships)
It has supplied , directly or through contractors, almost all thermal insulation covers of the competition swimming pools in public and municipal centres in Greece and Cyprus.
Important milestones of POOL SPORT INSTALLATIONS, among many others, were :
- Construction of the National Diving Training Center (Myrtha Pools) at the Agios Kosmas Sports Center (2003)
- Supply and installation of swimming equipment for the Olympic Games ATHENS 2004
- Construction of a swimming centre for the Municipality of Loutraki (Myrtha Pools) with 2 pools 50m & 25m (2009) Temporary elevation of Volos open swimming pool for the World Artistic Swimming Championships (2012)
- Supply & installation (through an international tender) of all thermal insulation covers (Favaretti Group) for the swimming pools of the Cyprus Sports Organisation (2013)
- Supply & installation of electronic timing equipment (Swiss Timing-Omega) of Olympic Games level at the Municipal Swimming Pool of Alexandroupolis (2017) and the Municipal Swimming Pool of Chios (2019)
- Completion of the design of a standard swimming complex, named PS-2515, of high specifications and quality characteristics. This study was submitted to the competent inspection service of the General Secretariat of Agriculture and received pre-approval of functionality (2017)
- Construction of 3 new swimming pools (Myrtha Pools) at O.A.K.A. "Spyros Louis" (2021)
- Upgrading of electromechanical & racing equipment of all swimming pools at O.A.K.A. "Spyros Louis" (2021)
- Supply & installation of the largest of its kind, telescopic shelter at the Municipal Swimming Pool of Lamia (2023)
- Supply & installation of an air-supported dome including a basketball/volleyball court and a changing room area at the Olympic Village (2023)
POOL SPORT INSTALLATIONS, apart from its permanent specialized staff, works closely with civil engineers, mechanical engineers, architects, technical specialists, etc., composing a highly experienced and qualified network of associates, providing services of high standards.